大发888体育投注

    1. <form id='mc1mv'></form>
        <bdo id='mc1mv'><sup id='mc1mv'><div id='mc1mv'><bdo id='mc1mv'></bdo></div></sup></bdo>

            Alsen has entered the new  year  of 2017 with new contracts. 

            2017 will celebrate the 15th anniversary of Alsen Maritime Co. Ltd. With its solid name in the ship design circle, Alsen has gone through the most difficult times of depressed shipping market and opened the door to the new year of 2017 with new contracts. Two 6000dwt chemical tanker project is to be concluded; One Local owner ordered a crane barge of about 100 meter LOA; Another local shipyard nominate Alsen to upgrade a 900TEU container newbuilding vessel; Australian owner received Alsen's  design of a Green Ferry with Zero emission; Further 10,000dwt chemical tanker on the line ... These added togethger may mark the stable steps that Alsen take upward into the new season and it may also show the turning point of the gloomy shipping market.

            Sulphur tanker conversion completed and sailed from the yard
            Alsen design 8500dwt chemical tanker launched in Aug

            Previous

            Next

            New Year Brings New Contracts for Alsen

            本网站由阿里云提供云计算及安全服务 Powered by CloudDream